Manzeene Village Estate: Stage 4 -12

Manzeene Village Estate: Stage 4 -12

Residential Subdivision • 2018

Since 2018, Civil Force have been contracted to construct stormwater drainage and sewer mains across multiple stages of this major development in Lara. Recent stages have also included works for the installation of the Sewer Pump Station (including the 1500mm diameter, 18-metre-long Emergency Storage Vessel) and construction of the associated Rising Main (pressure sewer), along with the drainage reticulation for the substantial wetlands.