The Point Estate: Stage 6A – 14

The Point Estate: Stage 6A – 14

Residential Subdivision • 2017

As a Barwon Water accredited contractor, Civil Force has been engaged repeatedly to construct the sewer, water and drainage on this large-scale and complex project since 2017. With experience in the construction of pressure sewer reticulation and the intricate de-watering processes required to conduct trenching works below the water table on these sites, Civil Force have again been assigned to the latest stage of this impressive development.